Our Previous Works

&

Past Clients

Bamfurlong, Staverton

Construction of a new road and retaining wall, works include :

- Excavating the existing site then laying and compacting     hardcore

- Casting footings for the retaining wall

- Installing precast retaining wall sections

- Shaping and backfilling retained ground

- Construction of the new road

UCAS, Cheltenham

Venturer was tasked with reconstructing the coping stones atop the building after they had debonded and started to move, causing a hazard to those below.

Each coping needed to be repositioned. So, all copings had to be removed, the existing mortar bed was cleaned off back to the brick face and then mechanical fixings applied to every stone.

Bristol Zoo

Venturer are constructing a new temporary construction access road to Bristol Zoo in preparation for future works.

Prior to the construction works, tree protection is being installed in accordance with BS Tree Protection guidelines.

Eastgate Street, Gloucester

Venturer was contracted by Gloucester City Council to construct concrete bases in the footway to mount gate posts, this includes removing block paving, excavating around buried services using a Vac-Ex, casting a slab beneath the services, mounting post bases and reinstating the footway.

Ontic, Staverton

Expansion of the staff car park, works include :

- Removal of trees and vegetation

- Installation of bike shelters

- Excavation to new formation level

- Concrete and new kerbs

- Laying and compacting of type 3 & permeable           bedding material

- Laying of block paving

St Oswald's

Venturer were contracted to bring the drainage of the retail park to an adoptable standard by replacing lengths of 600mm diameter 4m deep storm drains.

Works Included :

  • Removal of existing surfaces along drain runs to be replaced
  • Excavation of existing drainage
  • Supply and installation of new drainage
  • Reconstruction of manholes SWMH 14 & SWMH 24
  • UV Lining of storm drains
  • Replacing a compacting subsoil
  • Reconstruction of footway
  • Reinstatement of existing line drain, block paving and fencing
  • Grading and seeding topsoil

Tetbury Hospital

External improvements to Tetbury hospital,

Works included :

Foundation works for installation of new walkway canopy. Cutting of existing tarmac using floor saw in preparation for excavation to form concrete bases.

Laying new kerbs throughout the Hospital site along with new tarmac & timber bollards.

UCAS, Cheltenham

Demolition of exiting wall and construction of a new double skin brick wall, running alongside Evesham Road from the newer section of wall by side gate approximately 50m. Works involve demolition of existing brick wall and existing foundations, preparing ground for new foundations and erection of new wall.

Remedial Works, Kingsway

Remedial works, repairing numerous spots throughout Kingsway including replacing broken Kerbs and tactile paving, reinstating footways and crossings to repair areas of ponding and several other works to mend damaged or flawed areas.

Fersfield Gardens Playground

Resurfacing of Footway

  • Planing off existing cracked surface.
  • Laying a tack coat to create a fresh bond.
  • Laying fresh 6mm surface course by hand.
  • Rolling to compact and provide a smooth hardwearing finish.

BP Pangbourne, Reading

1,500 m2 of permeable paving to facilitate installation of new vehicle charging points at the BP Technology Centre.

Intoco, Staverton

Demolition and removal of  dilapidated industrial yard and full reconstruction of a new factory area with high load specification and high security fencing.

Foundation works for installation of new gantry crane in existing unit. Cutting of existing floor slab by diamond saw and removal in section to keep works dust free.

Naas Lane, Quedgeley

Construction of a 2m wide footway running along the existing carriageway and along Naas Lane towards Rudloe Drive to link to the existing footway. Works involves breaking the existing surface, partial excavation of the old carriageway to form the new footway, construction to form 2m footpath, placing stone, laying kerbs and Laying tarmac. 

Harvey Centre, Minsterworth

Widening of existing path to form disabled access, with construction of retaining wall with new fencing and lighting.

Resurfacing of existing car park and new fencing for child security.

UCAS, Cheltenham

Removal of existing dilapidated nursery. Construction of new patio area and refurbishment of existing patio area.

Slad Road, Stroud

New Property Infrastructure

        Works Included:

  • Piled foundations for house and retaining wall.
  • Reinforced ground beams for house and retaining wall.
  • 5m retaining wall.
  • Large cut and fill exercise
  • Construction of new driveway.
  • All drainage and oversite to DPC.
  • Natural stone paving to frontage.

Kings Square

Enabling Works

  • Demolition
  • Drainage
  • Surfacing
  • Site investigation
  • Concrete foundations
  • Fencing